From: route@monster.com
Sent: Tuesday, April 12, 2016 11:31 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: GIS Drafter
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Ahmad Fawad SJ, CA,
95123 408-396-6360 OBJECTIVE:
Engineering Quality
Assurance engineering expert with diversified combine experience of technical
consulting services for more than 8 years of and more than 15
years experience with Quality Program System Development in power
transformer manufacturing, Inspected transformers from design
stage thru production and testing. A
seasoned designer with PLS-Cadd, Bentley Micro Station V8i, Autodesk Inventor
2013 and AutoCAD releases 14, 2000, 2002,2004,2006,2007,2009,2010,2012,2013,2014. Prepared
electrical and mechanical production drawings using AutoCAD and Raster Image,
Control of new part number and description, generation and revision control
of Bill of Materials BOMs). Experience in managing digital inventories
of engineering infrastructures, CADD management, CADD design and CADD support
Experience in developing, verifying, and implementing engineering
specifications. Skilled
in obtaining solutions to project issues, Interface with other engineering
departments to coordinate the release of new products. Dynamic
team player and team builder, detail-oriented, creative, organized
professional and consistently motivating others toward success. Served as a
power-user for JDE Liaison between Engineering and Production TECHNICAL
SKILLS: Operating
System Windows
2003 Server, Windows Vista, Windows XP, Windows 7, Windows
8, Windows 2000, NT 4.0 and Windows 98, Windows 95, Windows 3.11,
MSDOS 6.22 Applications PLS-Cadd,
MicroStation V8i, AutoCAD 2000 thru 2014, Autodesk Inventor 2013, Raster
Image Design 2007, Google Earth, MS Access2007, MS Project, MS FrontPage, MS
Visio, SharePoint 3.0 services, MS Office 2003 and 2007, JDE,
Adobe Acrobat Reader/Writer, IBM (AS400) and CNC-KOMO Telecom Products Nortel Norstar Phone and Voice Mail System EDUCATION: 1977-1983-
Kabul University, Kabul Afghanistan BS- Hydro
Technical Engineering 1985-1986- San
Jose City College, San Jose CA Certificate of achievement in Electro-Mechanical
Drafting 1085 hours E/M Drafting Courses- Lettering,
tolerance, Multi-View Projections, Sectioning views, Auxiliary views,
Revolution, Dimension, Threads, Fasteners, Graphic Fabrication,
PCB Drawings and Detailed PCB Layout 2000- Technical Certificate JDE
Manufacturing Engineer and CNC-KOMO RECENT
ACCOMPLISHMENTS Jan
2006-present- Auriga Corporation,
Milpitas, CA Mechanical Engineer San Diego Gas and Electric Substation Design QA/QC Currently supporting the QA/QC project team for Mesa
Rim, Garfield and Sycamore Substations for San Diego Gas & Electric
Company The followings are the scope of the projects: Mesa Rim Substation Scope: Relay upgrade for breakers, Added new circuit
breakers, New Panels for Annunciator, Breaker controls. Garfield Substation Scope: Added new protection relay for the line, added
new panel. Sycamore Substations Phase I Scope: Added new protection relay for the line, added
new panel Sycamore Substations Phase II Scope: Added new protection relay for the line, added
new panel ·
QA/QC of wiring diagrams for
the control circuits of the circuit breakers for Substation ·
Review, identify and request
necessary drawings of the existing control and protection scheme of stations ·
Revise and review electrical
engineering design drawings that include one-line diagram, three-line schematic,
DC schematic, physical layout drawings, wiring/interconnection
drawings, annunciation, RTU function ·
SEL port assignment for the
communication processor, verified RTU point list ·
Work with Bill of Material
and cable schedule verification. PG&E-Gold
Hill 8 miles Road 230kV Transmission Line Project Worked on T-line Project for Gold Hill 8 miles Road
230kV to develop PLS-CADD model of the existing line based on survey, line
loading data and existing drawings and documentation supplied to Burns &
McDonnell •
Graphically sagging conductors to match
the survey data and weather conditions at the time of survey •
Determining the number of spans having
clearance discrepancies. § Raising
existing towers § Creating
Plan and Profile drawings for the non-compliant spans. § Providing
punch-list detailing tower modifications based on PG&E evaluation § Providing
PLS-CADD .bak file and all other CAD files. § Providing
drawings to reflect As-Built per Construction field notes. San Diego Gas & Electric-TL660
Encinitas-Del Mar 69-kV Line, Solano Beach Stub Pole Relocation Worked on T-line Solano Beach Stub Pole Relocation Prepared the Bases of Design for SDG&E to replace
four (4) guyed wood poles with self supporting poles to eliminate the guys
and guy stub requirements The transmission line is an existing 69-kV single
circuit with 12-kV under build and secondary services. Four (4) poles: Z24481
(41), Z24482 (42), Z24483 (43), AND Z24484 (44) are to be replaced and two
(2) require the relocation or replacement of transformers to serve residences NERC
Mitigation Waves 14-20 (PG&E) The scope of this project was to mitigate the
identified NERC discrepancies with PG&E required criteria which may
require structure raises, facility modifications and/ or replacements. Ø Submitted the 30% Engineering Design and
Constructability Review. Ø Submitted 60% review of the proposed mitigation
(SOW) with the appropriate PG&E personnel, to update/revise and issue a
final SOW. Ø Submitted 95% Design Review package and conduct a
Design Review of the proposed mitigation (SOW) with the appropriate PG&E
personnel. Ø Submitted IFC electronic Notification and hard
copies of the IFC package, Updated PLS-CADD Model based on project scope
document. Ø Generated a Tension Check Report (actual vs. design)
for each span with a discrepancy. Ø Modified existing Structure Data Sheets to
incorporate changes required to support the tower raises. Ø Provided bill of materials to PG&E for required
hardware and assemblies (based on coordination with PG&E). Ø Provided necessary drawings for mark up of Caltrans
Crossing / Safety Installation, incorporate field mark ups of drawing for
submittal to Caltrans for crossing permit. WARM
SPRINGS EXTENSION Design-Build Line, Track, Station, and Systems Worked on the first phase of
the project: Typical Design drawings for radio The scope included to prepare
new AutoCAD drawings for the 800 MHz trunked radio System for the WSX
Extension Detail drawings
including panel and cabinet layouts, equipment, interconnection
diagrams, equipment and material lists, manufacturer's descriptive and
technical literature, catalog cuts, and installation instructions. SMUD (Sacramento
Municipal Utility District) Worked on Upgrading Relay
Protection for Carmichael (CAR) and Orangevale (OVL) 230/69 kV Transformer project: The
scope included to prepare new AutoCAD drawings for "Insert Panel
A", for Transformer Bank #1 and Breaker 5930 Controls &
Relay Protection (One Line Control & Relaying Drawing), AC Schematic
Drawing, Protection Drawings (Differential & Over current), DC
Control Elementary Diagrams for Transformer High side 230kV
& Lo side 69kV, "Insert Panel A" Layout and Wiring
Diagrams, including wiring to new RTU and Device Nameplate
schedules Kyrgyzstan 500
kV Transmission Line and Substation Single Line Diagram (USTDA
funded project) - As a member of the project team Mr. Fawad
developed substation single line diagrams using AutoCAD, version 2006and
utilized Google Earth to develop a comprehensive GIS database to be
integrated with the Utility management system. City
of Lodi 60kV
Transmission Line, Substation site selection and as-built Single Line
Diagrams. As a member of the project team Mr. Fawad identified optimum
alternatives for new substation site and transmission line relocation.
Developed substation single line diagrams using AutoCAD, version 2006, and
Google Earth to develop a comprehensive GIS database to be integrated with
the Utility management system. TID
(Turlock Irrigation District) Verification
of the power, signal and communication systems as- built and as-is
construction and drawing update. As a member of the project team Ahmad
performed site, system and facility walk-downs and red-lined drawings or
develop sketches as necessary to document the as-built configuration.
The scope included development and/or update drawings for fiber conduit
and cable tray layouts, panels layouts, wiring diagrams, single line
diagrams, schematic diagrams, sonnet equipment Diagrams,
Jungle Mux Node assignment diagrams, wiring schedules, and
conduit schedules. San
Mateo County Transit District Caltrans Digital
Microwave Communication System. Ahmad prepared equipment and electrical
room layout and schematic drawing for the new system. Developed
equipment mechanical installation and telecommunication related designs and
drawing. BART Test Engineer Ahmad
performed numerous automatic fare collection system tests in support of
the BART Only Smart Card and TransLink (Clipper Card): ∙ 7000
BART Only Smart Card (BOSC) ∙ TransLink system
integration field testing (800,000 transactions) ∙ TransLink Phase
2-Fare Gate Integration-System Integration Test-Integration Test 5
(IT5)- Test Plan, Procedure and conduct. ∙ TransLink Fare
Payment System FACI (First Article Configuration Inspection) Metropolitan Transportation Commission Ahmad
conducted field operability testing of the TransLink On-Board
Equipment including FACI (First Article Configuration Inspection) SCE
(Southern California Edison) Mr.
Fawad provided AutoCAD design to update for Fiber Optics such as shelf
layouts, equipment rack layouts, T1 wiring diagrams, alarm points wiring
diagrams, single line diagrams, schematic diagrams, Alcatel MDR-8000 wiring diagrams,
conduit schedules, floor plan and site plan. 2002-2005 ENTREPRENEUR
- MANAGED OWN BUSINESS RELEVENT ACCOMPLISHMENTS 1999-2002 Waukesha
Electric System, Milpitas CAEngineering Quality ∙ Served
as a liaison between engineering and production line. ∙ Inspected
Transformers from design stage to production line based on design and
customer requirements as follows: ∙ Transformer
Core Cutting Inspection ∙ Transformer
Coil Winding Inspection ∙ Transformer
Winding Assembly Inspection ∙ Tanking
Inspection ∙ Transformer
Testing Inspection ∙ Daily
production meeting presence and issue follow-up, coordinate point of
engineering NCR’s, Manage NCR’s
within engineering, NCR’s ownership assignment, NCR’s completion and
response tracking and ECO communication back to manufacturing. ∙ CARB
(corrective action review board) activity participation ∙ Recommend
CAR’s to improve engineering quality, assign CAR’s within engineering,
and implement process improvements to the engineering quality system
based on NCR, FDR and customer survey feedback, CAR tracking and
completion. ∙ Quality
system development ∙ Developed
detailed checklists for engineering, toll gate keeper and management of
checklists, coordinate design for manufacturability activities within
engineering and coordinate weekly meetings with design, quality and
production departments to review engineering drawings before shop
release ∙ Created
Tollgate, checklists and NCR’s log sheets. ∙ Attended daily
production and weekly CARB and NCR’s meetings and appointing the
NCR’s ownership. ∙ Managed
engineering archive. ∙ Served
as a power-user for JDE. ∙ Created
JDE instructions for all JDE users ∙ Power
Point presentation ∙ Reported
directly to the Engineering Manager. 1988-1999 North
American Transformer, Milpitas CA Senior Engineering
Technician Responsible
for ordering materials for transformers, create and design of Oil Flow
Washers, connection diagrams, major insulations, interpretation of
customer needs for test department, detailing of engineering design and
creating of BOM(Bill Of Material) for production line 1986-
1988 Reliance Electric System, Milpitas CA Electro-Mechanical
Drafter ∙ Detailing
of transformers design layout for production purpose using Auto-Cad, Q-Pro
spreadsheets and IBM (AS-400, SYS-36). TECHNICAL
PROPOSAL PREPARATION ∙ Using
AutoCAD 2012 and Micro-station v8i, preparing, and updating engineering
and technical drawings ∙ Using MS-Word,
creating Proposals of (IT, Telecommunication, Engineering and Transportation)
projects for the Local, State and International clients. ∙ Managing
the Projects and Proposals Archive ∙ Organized,
create and formatted the Proposal Template ∙ Created
synopsis of the personal ∙ Using
MS-Projects, Creating Project Schedule ∙ Using
MS-Visio, Creating the Organization Chart and the RFP process ∙ Using
Acrobat Reader/Writer, converting Word doc. to PDF and much more ∙ Created
PowerPoint Presentations IT
SUPPORTS / Business Development IT
Administrator Provided
IT support Services for Auriga’s IT System As
an IT admin ordering computers and laptops, executing equipment replacement
activity, updating asset management system to reflect work performed,
monitoring daily activity, installing and maintaining PC hardware and
software, troubleshooting network usage and computer, perform system backups
and data recovery, resolve network communication problems, e-mail
administration, disk capacity monitoring and network security, and other
administrative duties. More 6 years experience with PC support, including
deployment with PC hardware troubleshooting and repair. Escalate quickly when
issues arise. Assist other technicians as needed. Business
Development Associate ·
Member of business
development team, coordinating efforts of multiple technical and logistical
team members to respond to local and international Requests for
Proposals/Qualifications (RFP) and RFQ) ·
Developed annual marketing
analysis of internal proposal development process to identify gap analytics
and improve proposal turnaround by 2-4 days ·
Developed spreadsheets to
track proposal generation and marketing developments on a weekly basis |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
Farsi |
Fluent |
|
|
Pashto |
Intermediate |
|
|
|